-
AVR Substation Switch Adjustments (Spanish)
3:05
This video demonstrates how to properly inspect and adjust an AVR substation switch to ensure smooth, accurate operation and full closure.
-
AGCH5 Insulators Installation (Spanish)
2:43
Installation of insulators and adjustment for Hubbell’s Center‑Break Switch prior to mounting on the structure.
-
AGCH5V Level Adjustment (Spanish)
1:52
Adjustment for Hubbell’s Center‑Break Vee Switch prior to mounting on the structure.
-
Mounting the Switch and Controls (Spanish)
8:30
In this training, we will walk through the proper installation and adjustment of the switch assembly, including pipe alignment, gearbox installation, and final travel adjustments.
-
Mounting the Switch and Controls
8:20
In this training, we will walk through the proper installation and adjustment of the switch assembly, including pipe alignment, gearbox installation, and final travel adjustments.
-
AVR Substation Switch Adjustments
2:56
This video demonstrates how to properly inspect and adjust an AVR substation switch to ensure smooth, accurate operation and full closure.
-
AGCH5V Level Adjustment
1:44
Adjustment for Hubbell’s Center‑Break Vee Switch prior to mounting on the structure.
-
AGCH5 Insulators Installation
2:43
Installation of insulators and adjustment for Hubbell’s Center‑Break Switch prior to mounting on the structure.
-
FlexMO® - User Menu Lockout Switch
0:53
The FlexMo® Solid State Motor Operator comes standard with a user menu lockout switch.
-
FlexMO® - Diagnostic Screens
1:17
How to access the Diagnostic Screens on the FlexMO® Motor Operator
-
FlexMO® - Reset Cycle Count
1:06
How to reset the cycle count on the FlexMO® Motor Operator.
- Next Page